Tasbet
and Duvha Housing Development
Historical
Context and Background Information
The
Witbank Housing Project seeks to provide affordable high quality
rental housing together with the necessary infrastructure
to house 5000 families. The original housing project of 3,000
housing units was approved by the Mpumulanga Housing Development
Board as an institutional subsidy project. The problem obtaining
low interest senior debt funding for the beneficiaries meant
that the selling price of the housing units exceeded the affordability
of the subject target group. The opportunity arose to participate
in the rental housing initiative arising out of the Job Summit
of October 1998.






By
converting this project to one that conformed with the recommendations
and guidelines of the Presidential Job Summit Project on Housing,
the original development principles, i.e. providing quality
houses at an affordable rate, could be met. The original obtained
the support of the Department of Local Government and Housing
because it addressed the needs of the people in the area where
a shortage of approximately 20,000 houses is recorded. Officials
of the Department of Housing in Mpumulanga ensure that the
additional 2000 subsidies would be made available for the
initiative. The total of 5000 subsidies were transferred to
National Housing for disbursement for the Witbank Project.




Of
the 64 applicants at the Job Summit submitting project applications,
Witbank Housing Project was identified as being worthy of
inclusion within the framework of the Presidential Job Summit
Pilot Project on Housing (PJSPPH). The project targets the
employed low-income group with housing options ranging between
35 and 56 square meters.
The project has been extensively discussed at municipal level
with a view to creating a complete built environment and has
received widespread support. The project includes amongst
others, provision for 8 schools, both primary and secondary,
community facilities, commercial centres and an efficient
transport routes on paved roads. In fact, within a 250-300m
walk of any home one is able to reach all of the above amenities.
On 10th February 2000, the Minister of Housing announced the
first of three pilot projects to be included within the framework
of the Presidential Job Summit Pilot Project on Housing; Witbank
was one of the successful bidders.
Broad
Development Strategy
This
development is viewed as an important contribution to the
local economy. The development approach seeks to maximise
opportunities with a view to local economy stimulation. The
approach seeks to seek the balance between delivery time and
maximum job creation.
Design
Rationale
The
planning approach is not seen merely as a construction activity,
but rather as a step towards upgrading the living conditions
in a broader sense. Special emphasis is placed on detail living
environmental issues, such as urban design criteria and attractive
street scenes. The area is planned with all supportive land
uses and is intended to create a self-contained urban environment
over the medium terms in line with budget constraints. The
project should be seen as a new trend in the housing environmental
concept, which will encourage a process of social upliftment,
community re-integration and education which will have far
reaching benefits, not only for the future residents, but
also for the surrounding communities. The Project Area can
be regarded as a "high quality infill area" located
between two medium income communities. The overall development
strategies are outlined below.
-
The intended project is aimed at providing affordable and
economic rental housing for the
low-income
group.
-
Due to the housing needs, the intended development can make
provision for a residential
mix
with innovative housing solutions based on individual affordability.
-
The Project Area must be evaluated as a sensitive interface
area, linking the existing
informal
housing settlement to the south and west with affordable housing
to the east as
envisaged
by this project.
-
Aspects such as quality of environment and maximum value for
money receive high priority
in
order to minimise the impact on the existing built up areas.
Development is to take place
in
accordance with market sensitivity and affordability whilst
addressing housing needs and
facilitate
relocation of households to obtain a normal urbanised environment.
-
Supportive land uses are used efficiently in order to create
effective transition between
sensitive
areas and further to protect investment values of individual
values of individual
families
and;
-
Proper integration in respect of different land uses and opportunities.
The
Township Layout

Rationale
The
layout format was basically dictate by the following rationale:
-
The layout should provide a functional and aesthetically pleasing
urban environment.
-
Effective linkages should be created with other surrounding
areas in order to effect
an
integrated total development.
-
The design should cater for the specific needs of the target
community.
-
The layout should accommodate modern town planning principles
that will promote
community
ownership and upgrading options over the medium and longer
term.
-
The layout should promote innovative and modern housing solutions,
subject to
community
preferences and sufficient provision should be made for the
creation of
social
infrastructure and supportive land uses, which could contribute
to the
establishment
of a balanced community.
Process
Overview

Roads
The
primary road requirements are to provide a road network within
the framework of the prescribed hierarchy, which will not
only promote the Project Area as an integrated unit, but also
cover the following important factors:
-
Promote ease of access to and from road systems
-
Promote safe and effective movement of traffic
-
Promote an aesthetically pleasing environment
-
Provide a road system, which will be both practical and economically
feasible
-
Channelise vehicular traffic to higher order roads, and in
doing so, protecting lower
roads
for pedestrian movement and;
-
Provide links to a road network system already in existence.
Residential
Profile
The
total value for 5000 units is R320 000 000,00 (Three Hundred
and Twenty Million Rand)


Construction
Approach
The
construction method involves a joint approach between established
and emerging contractors. The emphasis is placed on labour
intensive methods. In order to ensure structural integrity,
all building will be erected upon waffle slabs. The walls,
which are built upon the waffle slab, will be built out of
bricks. Our choice of pigmented bricks as the wall construction
method is based on the following factors:
-
It is a traditional walling method and complies to standard
building regulations.
-
It is a walling method best suited to the training of emerging
contractors in skills, which
will
be essential for sustainability.
-
It is a walling system with the least maintenance in the long
term i.e. no painting